Assembly process No.
S-1
4. Prepare the floor.
•
Corks (M) for M16 tap (12 pieces), corks (N) for M20 tap (15 pieces), and corks (P) for M24 tap
(6 pieces).
•
Remove bolt (Q) and ground surface protector plate (R).
•
Remove mounting bolts (T) (3 pieces) of duct (S), loosen band (W), and remove duct (S).
S
T
M
Precautions
Installation of operator's cab (4/16)
W
P
Necessary tools
Name
Other remarks
53
Q R
N
Necessary equipment
Q'ty
Name
Q'ty