Detail A:
C. Tighten the 5/16” 18 x 7/8” hex bolts, flat washers, and flange nuts to 144 in lbs (dry) and set these
assemblies aside.
D. Next, assemble the two double rail units. Each unit will consist of two 56” Module Support Rails,
two 68” Module Support Rails, and two rail Connectors. The two 56” sections need to be together
on the same end of the assembly. Lay two 56” and two 68” Module Support Rails end to end and
back to back with a Connector in the middle on both sides
side flanges with the obround holes and the side of the Connectors with the obround slots are all
facing in the same direction, and that the two 56” rails are on the same end of the assembly as
shown in Detail B.
as shown in Detail B. Make sure that the
,
5