Ivizion2 Operational Flowchart; Validation - JCM GLOBAL iVIZION2 Series Integration Manual

Table of Contents

Advertisement

Section 7
iVIZION™2 Series Banknote Validator Foundation of Intelligent Validation

iVIZION2 Operational Flowchart; Validation

Figure 23 iVIZION2 Operational Flowchart;
Validation
A
a
YES
b
NO
c
d
YES
f
g
NO
YES
h
k
l
NO
C
*1 When Abnormal Output Signal condition occurs, remove the Banknote causing the malfunction and re-apply power to the Unit, or send a Reset 
Command to the Banknote Validator.
*2 When a Stacker Full signal occurs, remove the Banknotes from the Cash Box and re-install it into its fully seated position. The Unit will the 
automatically re-initialize itself.
P/N 960-000231R_Rev. A
NO
YES
e
NO
i
NO
YES
j
YES
m
Figure 23 iVIZION2 Operational Flowchart; Validation
A) Begin Validating
a) Is Validation Result OK?
b) Is Banknote Unacceptable?
c) Output the Denomination Value Signal
d) Receive Stacking Command?
e) Reject Banknote
f) Continue Transporting Banknote
g) Is Banknote sent to Stacker?
i) Retry 3 times?
h) Output a VEND Signal
j) Stop Performance: Output Abnormal 
Signal (*1)
k) Banknote Stacking
l) Is Stacker Full?
m) Stop Performance: Issue Output Stacker 
Full Signal (*2)
C) Return To Stand-by Mode (Figure 22).
© 2022, JAPAN CASH MACHINE CO., LTD.
3 0
Operational Flowcharts

Advertisement

Table of Contents
loading

Table of Contents