Installation Instructions - Installation Of Connectors; Installation Instructions - Battery / Battery Pack Installation And Dip Switch Setting Verifi Cation - Assa Abloy Sargent Passport 1000 PG Installation Instructions Manual

Mortise lock
Hide thumbs Also See for Sargent Passport 1000 PG:
Table of Contents

Advertisement

Passport 1000 PG
Mortise Lock
15

Installation Instructions - Installation of Connectors

Secure the following
connectors onto the circuit
board (Figure 15 and Detail):
Note: Connectors go on only
one way. Do not force and do
not offset connectors.
Be sure they are completely
seated (fl ush).
1. Secure the mortise lock
body assembly connector
(10-pin).
2. Secure the mortise keypad/
card reader connector
(14-pin).
3. Secure the LCU connector
(7-pin).
16
Installation Instructions - Battery / Battery Pack Installation and DIP Switch
Setting Verifi cation
1. Place (6) "AA" batteries into the compartment being careful to
align polarity (- & +) properly.
2. Insert battery pack and click into place, making sure polarity
terminals on the battery pack are oriented upwards (Figure 16).
3. Verify DIP switch settings are correct for the application.
PERSONA PG Controller DIP
Switch Settings (Fig 10A):
ON
OFF
ON
OFF
1-800-727-5477 • www.sargentlock.com
Copyright © 2012, 2022, SARGENT Manufacturing Company. All rights reserved.
Reproduction in whole or in part without the express written permission of SARGENT Manufacturing
Company is prohibited. Patent pending and/or patent www.assaabloydss.com/patents.
Figure 15 Detail
SARGENT mortise lock with and
without deadbolt:
• Switch 1 and 2 - OFF
• Switch 3 - ON
SARGENT cylinder or exit locks:
• Switch 1 - OFF
• Switch 2 and 3 - ON
From outside trim
(ground)
From outside trim
(card reader)
From outside
trim (keypad)
From lock body
PERSONA PG
controller DIP
switch location
14
Detail
Figure 15
Figure 16
A7807D 12/22

Advertisement

Table of Contents
loading

Table of Contents