Checklist Before And After Operation - AGFA Valory User Manual

System with floor mounted column
Table of Contents

Advertisement

Checklist before and after operation

The user shall perform these checks before, during and after operating the
system.
Table 5: Checklist
Check
Before starting the system
Are unnecessary objects present near the
equipment?
Has an examination room been checked
for safety?
Is there any equipment cable caught, twis-
ted, or rubbing against other objects
Has any moisture been collected on a ca-
ble connector?
Has any cable insulation been damaged?
Is there any dent, crack or condensation
visible on the equipment?
Are all cables connected correctly?
After starting the system, before operation
Does the display flicker?
Is there any unusual smell?
Does the system produce abnormal
noises?
Has conditioning been performed on the
X-ray tube?
Is there an error in the operation of the
accessories?
After operation, before stopping the system
Does the display flicker?
Is there any unusual smell?
Does the system produce abnormal
noises?
Valory (system with floor mounted column) | Introduction | 67
Mitigation
Remove unnecessary objects
near the equipment.
Check if the room is safe.
Position/wire cables correctly.
Dry the cable connectors.
Contact the manufacturer.
Contact the manufacturer.
Connect the cables correctly.
Contact service.
Stop the system, and contact the
manufacturer.
Stop the system, and contact the
manufacturer.
Perform conditioning of the X-
ray tube.
Contact the manufacturer.
Contact service.
Stop the system, and contact the
manufacturer.
Stop the system, and contact the
manufacturer.
0426A EN 20220804 1858

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

5540/100

Table of Contents