Maintenance; System Maintenance Procedures; Adding A Rectifier; Field Installing Compact Type Load Distribution Circuit Breakers In A List Ba And List Bb Distribution Unit - Vertiv NetSure 2100 Series User Manual

48 vdc power system
Hide thumbs Also See for NetSure 2100 Series:
Table of Contents

Advertisement

Vertiv™ NetSure™ 2100 Series -48 VDC Power System User Manual

4 Maintenance

4.1 System Maintenance Procedures

It is recommended to perform the maintenance procedures listed in Table 4.1 every 6 months to ensure continual system operation.
Table 4.1 Maintenance Procedures to be Performed at 6-Month Intervals
Check ventilation openings for obstructions such as dust, papers, manuals, etc.
Inspect and tighten all installer's connections.

4.2 Adding a Rectifier

To increase system current capacity, a rectifier module can easily be added if an empty rectifier module mounting position is available.
Refer to rectifier instructions UM1R481000e3 for a rectifier installation procedure.
4.3 Field Installing Compact Type Load Distribution Circuit Breakers in a List
BA and List BB Distribution Unit
Refer to "Installing Compact Type Load Distribution Circuit Breakers (List BA, BB)" in the Installation Manual (IM582138000).
4
Procedure
Proprietary and Confidential © 2022 Vertiv Group Corp.
Referenced In
--
IM582138000

Advertisement

Table of Contents
loading

Table of Contents