Vertiv™ NetSure™ 5100 Series -48 VDC Power System User Manual
Figure 4: SM-DU Circuit Card in a List 60 Hybrid Connection Cabinet

4 Maintenance

4.1 System Maintenance Procedures

It is recommended to perform the maintenance procedures listed in Table 3 every 6-months to ensure continual system operation.
Table 3: Maintenance Procedures to be Performed at 6-Month Intervals
Procedure
Check ventilation openings for obstructions
such as dust, papers, manuals, etc.
Inspect and tighten all installer's
connections.