Vertiv™ NetSure™ 7100 -48 VDC Power System User Manual
4 Maintenance
4.1 Important Safety Instructions
DANGER! Adhere to the "Important Safety Instructions" starting on page v.
4.2 System Maintenance Procedures
It is recommended to perform the maintenance procedures listed in Table 4.1 every 6-months to ensure continual system operation.
Table 4.1 Maintenance Procedures to be Performed at 6-Month Intervals
Procedure
Check ventilation openings for obstructions
such as dust, papers, manuals, etc.
Inspect and tighten all installer's connections.
4.3 Adding a Rectifier Module to an Empty Module Mounting Position
To increase system current capacity, a rectifier module can easily be added to a module mounting assembly that contains an empty
rectifier module mounting position.
Refer to Rectifier Instructions UM1R483500E3 for a rectifier installation procedure.
NOTE!
It is recommended that the current limit point be checked whenever a rectifier module is added to or removed from
the power system. Refer to "Checking the Controller's Current Limit Point after Adding or Removing a Rectifier Module" on
page 9.
NOTE!
The rectifier module being added is assigned by the controller the lowest available identification number. If desired,
you can change the identification number. Refer to the NCU Instructions (UM1M830BNA) for a procedure.
4.4 Installing Optional EIB (Controller Extended Interface Board)
Refer to the procedure in the Installation Manual (IM582127000900).
8
Referenced In
--
IM582127000900,
"Making Electrical Connections" section.