Positioning The Machine - Wexiodisk WD-B 550S Installation And User Manual

Table of Contents

Advertisement

Installation instructions

3.5.4 Positioning the machine

Check the following points before the machine is placed in position:
Place the machine in position and check that it, and any accessories, are
horizontally level. Adjust the height with the legs.
Once the machine has been filled with water, do another check to make sure the
machine is horizontal.
WD-B 550S - WD-B 950S
Fit the chain (A) to the drive motor.
A
Drive motor with drive shaft in outfeed section
A = Chain
Pull out and connect the electric cables for the pumps and other
components. The cables are located at the section joint. Each cable is
marked with the same designation as the component to which it must be
connected. The marking for each component is on the component itself
and on the machine's stand. The cables are positioned in existing cable
runs.
Check that the fuse for the machine at the site is off, blocked and that
outgoing electrical circuits from the machine are non-live.
Remove the protective plastic on the sides which are to be stood against a
wall.
The distance between the wall and machine should be at least 50 mm.
Lateral tilt: Place a spirit level on the body of the machine at the infeed and
outfeed.
The machine's longitudinal direction: Place the spirit level across the body
of the machine.
19
35-1-00-014
Rev. (202209)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wd-b 950s

Table of Contents