Operations And Checks After Starting Engine - Komatsu D155A-6 Operation & Maintenance Manual

Hide thumbs Also See for D155A-6:
Table of Contents

Advertisement

OPERATION

OPERATIONS AND CHECKS AFTER STARTING ENGINE

If there has been any Emergency stop, abnormal actuation or trouble, turn the starting switch key to the OFF position.
If the work equipment is operated without sufficiently warming the machine up, response of the work equipment to movement
of the control lever will be slow, and the work equipment may not respond as the operator desires, so always perform the
warming-up operation. Particularly in cold areas, be sure the warming-up operation is completed.
BREAKING IN THE MACHINE
NOTICE
Your Komatsu machine has been thoroughly adjusted and tested before shipment from the factory. However, operating the
machine under full load before breaking the machine in can adversely affect the performance and shorten the machine life.
Be sure to break in the machine for the initial 100 hours (as indicated on the service meter).
Make sure that you fully understand the content of this manual, and pay careful attention to the following points when
breaking in the machine.
Run the engine at idle for 15 seconds after starting it. During this time, do not operate the control levers or fuel
control dial.
Idle the engine for 5 minutes after starting it up.
Avoid operation with heavy loads or at high speeds.
Immediately after starting the engine, avoid sudden starts, sudden acceleration, unnecessary sudden stops, and
sudden changes in direction.
WARNING
OPERATION
3 - 121

Advertisement

Table of Contents
loading

Table of Contents