Installation Environment And Installation Position; Installation Environment; Installation Position - Mitsubishi Electric NZ2GF-CCB User Manual

Cc-link ie field network-cc-link bridge module
Table of Contents

Advertisement

6.2

Installation Environment and Installation Position

6.2.1

Installation environment

(1) Installation location
Do not install the bridge module to the place where:
• Ambient temperature is outside the range of 0 to 55;
• Ambient humidity is outside the range of 5 to 95% RH;
• Condensation occurs due to rapid temperature change;
• Corrosive gas or combustible gas is present;
• Conductive powder such as dust and iron powder, oil mist, salinity, or organic solvent is filled;
• The bridge module is exposed to direct sunlight;
• A strong electric field or strong magnetic field is generated; and
• The bridge module is subject to vibration and shock.
(2) Installation surface
Install the bridge module on a flat surface. When the installation surface is uneven, excessive force is applied to
the printed-circuit board, causing a failure.
6.2.2

Installation position

When installing the bridge module in a control panel, provide clearance of 60mm or longer between the module and
the sides of the control panel or neighboring modules to ensure good ventilation and to facilitate a module change.
60mm
or longer
60mm
or longer
60mm
or longer
CHAPTER 6 INSTALLATION AND WIRING
60mm
or longer
6
39

Advertisement

Table of Contents
loading

Table of Contents