Mitsubishi Electric NZ2GF-CCB User Manual page 62

Cc-link ie field network-cc-link bridge module
Table of Contents

Advertisement

(a) Operating procedure
The following is a procedure of CC-Link parameter setting using the engineering tool.
1.
Set the startup mode switch of the bridge module to PRM.
2.
Open the "CC IE Field Configuration" window.
• An example of when the master/local module is the QJ71GF11-T2
Project window  [Parameter]  [Network Parameter]  [Ethernet/CC IE/MELSECNET]  [CC IE
Field Configuration Setting] button
3.
Select the bridge module in "List of stations" on the "CC IE Field Configuration" window.
List of stations
4.
Open the "Parameter Processing of Slave Station" window.
[CC IE Field Configuration]  [Online] [Parameter Processing of Slave Station].
5.
Set "Method selection" to "Parameter read".
6.
Click the [Execute] button and the following window is displayed.
7.
Click the [Yes] button.
60