Drying Dampness; Instructing The Operating Personnel; Checking The Accessories; Checking The Interlocks Mechanically - Siemens NXAIR Installation Instructions Manual

Medium-voltage switchgear
Hide thumbs Also See for NXAIR:
Table of Contents

Advertisement

Please visit below website to register to the SIPROTEC and SICAM security update report to receive latest
news.
www.siemens.com/gridsecurity
Before
commissioning
For latest firmware version for Siemens devices please visit below internet site.
http://w3.siemens.com/smartgrid/global/en/products-systems-
solutions/downloads/Pages/Overview.aspx
For protection relays of other manufacturers please get in touch with the Original Equipment Manufacturer.

14.3 Drying dampness

If the panels become damp by condensation or high humidity, e.g. prevailing during erection, they must be
dried. Use several electrical heaters of 1000 to 2000 W each. Alternatively, the anti-condensation heater must
be switched on if such is part of the switchgear.
The warm air has to flow through all compartments of the switchgear until the panels are completely dry. Take
the withdrawable part / switching-device truck out of the panel to support the air flow.

14.4 Instructing the operating personnel

Give the Operating Instructions with order number 110-0134.9 to the operating personnel in
good time.
Instruct operating personnel in theory and practice of switchgear operation.
Make sure that the operating personnel are familiar with all operational details when the
commissioning procedure takes place.

14.5 Checking the accessories

Provide the following accessories to have them ready to hand:

14.6 Checking the interlocks mechanically

110-0084.9 / 15
please
ensure
that
Operating instructions
Racking crank for moving the withdrawable part / switching-device truck
Operating levers for the earthing switches
Slip-on lever for the shutters (optional)
Hand crank for the spring energy store
Racking tool for the removable voltage transformers (optional)
Double-bit keys
Circuit diagrams
Warning signs
Voltage tester or voltage detecting system
NOTICE
Detection of an error
Do not put the switchgear into operation.
Inform the regional Siemens representative.
NXAIR /
Commissioning procedure
the
firmware
of
protection
40 kA
relays
is
up-to-date.
207

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents