Siemens NXAIR Installation Instructions Manual page 164

Medium-voltage switchgear
Hide thumbs Also See for NXAIR:
Table of Contents

Advertisement

Electrical connections
Connect one single cable each with a cable sealing end. Connect one cable sealing end each
with a cable lug.
Lay the components of the floor cover into the bottom pan. While doing so, insert the rubber
sleeve in the floor cover.
Bolt the components of the floor cover together using the connecting elements (1) and (2).
Fig. 234: Assembly of the floor cover
Insert the cable bracket (1), and put it in position.
Fasten the cable bracket using the connecting elements (2).
1
2
Fig. 235: Assembly of the cable bracket
Fasten the cable to the cable bracket underneath the heat-shrinkable splitting cap; use a clamp.
164
2
1
NXAIR /
40 kA
(1) 4 bolts size M8x20
12 bolts size M8x20
(2)
plus plain washers
size 8 acc. to ISO 7093
(1) Cable bracket
4 bolts size M8 plus
(2)
plain washers size 8
acc. to ISO 7093
110-0084.9 / 15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents