Section 3: Performance Verification; Introduction; Equipment Needed; Performance Tests - Mallinckrodt NELLCOR NPB-195 Service Manual

Table of Contents

Advertisement

SECTION 3: PERFORMANCE VERIFICATION

3.1

INTRODUCTION

3.2

EQUIPMENT NEEDED

3.3

PERFORMANCE TESTS

3.1 Introduction
3.2 Equipment Needed
3.3 Performance Tests
3.4 Safety Tests
This section discusses the tests used to verify performance following repairs or
during routine maintenance. All tests can be performed without removing the
NPB-195 cover. All tests except the battery charge and battery performance
tests must be performed as the last operation before the monitor is returned to the
user.
If the NPB-195 fails to perform as specified in any test, repairs must be made to
correct the problem before the monitor is returned to the user.
Equipment
Digital multimeter (DMM)
Durasensor ® oxygen transducer
Oxisensor ® II oxygen transducer
Pulse oximeter tester
Safety analyzer
Sensor extension cable
Serial interface cable
Stopwatch
The battery charge procedure should be performed before monitor repairs
whenever possible. It should also be performed before returning the instrument
to use.
Note:
This section is written using Mallinckrodt factory-set defaults. If your
institution has preconfigured custom defaults, those values will be
displayed. Factory defaults can be restored using the configuration
mode procedure described in paragraph 4.2.1 below.
Description
Fluke Model 87 or equivalent
DS-100A
D-25
SRC-2
Must meet current AAMI ES1/1993 &
IEC 601-1/1998 specifications
EC-4 or EC-8
EIA-232 cable (optional)
Manual or electronic
3-1

Advertisement

Table of Contents
loading

Table of Contents