Power-On Self Test; Related Documents - Mallinckrodt NELLCOR NPB-195 Service Manual

Table of Contents

Advertisement

Section 1: Introduction
1.3

POWER-ON SELF TEST

1.4

RELATED DOCUMENTS

1-4
1. Equipotential (ground) Terminal
2. AC Inlet
3. DB-15 Interface Connector
Figure 1-3: NPB-195 Rear Panel
When the NPB-195 is turned on it will perform a POST (Power-On Self Test).
During POST the following sequence should occur:
All indicator lights illuminate
All pixels in the LCD display illuminate
The backlight turns on and the Nellcor Puritan Bennett logo and software
version are displayed
Upon successful completion of POST, the NPB-195 sounds a 1-second tone
indicating that the monitor has passed the test.
If the start-up sequence is not completed as described above, do not use the
monitor.
The software version is often needed when calling Mallinckrodt's Technical
Services Department or your local Mallinckrodt representative for technical
assistance. Record the software version and have it available prior to requesting
technical assistance.
To perform test and troubleshooting procedures, and to understand the principles
of operation and circuit analysis sections of this manual, you must know how to
operate the monitor. Refer to the NPB-195 operator's manual. To understand
the various Nellcor sensors that work with the monitor, refer to the individual
sensor's directions for use.
1
2
TM
2X
SN
NELLCOR PURITAN BENNETT, INC.
T 0.50A 250V
PLEASANTON, CA 94588, U.S.A.
NELLCOR PURITAN BENNETT EUROPE BV,
CISPR 11
's-HERTOGENBOSCH, THE NETHERLANDS
Group 1
Class B
U.S. PATENTS:
4,621,643; 4,653,498;
4,700,708; 4,770,179;
R
4,869,254; Re. 35,122;
IPX1
100-120 V
200-240 V
4,928,692; 4,934,372;
5,078,136
012 3
NRTL/C
50/60 Hz 20VA
5
4
4. Fuse Receptacle
5. Voltage Selection Switch
3
NPB-195
MADE IN IRELAND

Advertisement

Table of Contents
loading

Table of Contents