5.11 Additional Accessory Installation; 5.12 Test The Installation - Will Burt 7-30 HDL Operating Instructions Manual

Pneumatic mast with remote locking system
Table of Contents

Advertisement

PNEUMATIC MAST WITH REMOTE LOCKING SYSTEM
OPERATING INSTRUCTIONS

5.11 Additional Accessory Installation

Depending on the configuration of the mast system, optional components selected, or the
installation environment, additional accessories and positioners may need to be installed. Install
any additional accessories as appropriate. Contact The Will-Burt Company with any questions
before performing any installation procedures.

5.12 Test the Installation

Follow all precautions while testing the mast system installation. The mast may operate better
with a payload on it. For procedures on installing a test payload, see Section 5.13.
To test the installation:
1. Review the Pre-Operation Check.
2. Prepare the mast system for operation.
3. Extend the mast.
4. For rotatable applications, rotate the mast.
5. Lower the mast.
Note: The drain cock shall remain open to drain water when the mast is not in use. The drain
cock shall be opened while a locking mast is deployed and depressurized to drain water. It is not
uncommon to have mast grease exit the drain or exhaust valve on initial mast use.
See Section 6 for additional details on these procedures.
TP-5580101-A
PAGE 125 OF 164
FEBRUARY 2022

Advertisement

Table of Contents
loading

Table of Contents