Lift The Mast System; Unpack The Mast System - Will Burt 7-30 HDL Operating Instructions Manual

Pneumatic mast with remote locking system
Table of Contents

Advertisement

PNEUMATIC MAST WITH REMOTE LOCKING SYSTEM
OPERATING INSTRUCTIONS
Table 5-4 (Continued)Hardware for Ultra Heavy Duty Installation
Hardware*
HHRC Holder (To the Mounting Structure)
(2) #8 (M4) Flathead
Screws
* Unless otherwise indicated, the mounting hardware must include proper means to resist vibration loosening such
as thread-locking compound or locking hardware. Torque all hardware as appropriate for its size and grade. Torque
values in these instructions assume the use of the The Will-Burt Company provided hardware. Depending on the
specific installation application, all hardware may not be used. Additional hardware may be required for additional
accessories or customer-specific applications.
5.4

Lift the Mast System

During installation, it will be necessary to lift the mast. The process described in this manual
represents a possible method of lifting the mast. Depending on the environment and equipment
available, other methods may work better. Use the best and safest method for your
circumstances.
5.5

Unpack the Mast System

Unpack the system as follows:
1. Carefully open the shipping crate.
2. Remove all loose components, the 2 x 4 inch (38 x 89 mm) block at the top end of the mast,
and the top half of the wooden mast saddles (Figure 5-2).
PAGE 78 OF 164
Supplied By
The bolts should be sized to length to allow for the
thickness of the HHRC, support structure, any
Customer
spacers, and all mounting hardware (e.g. flat
Figure 5-2 Shipping Crate
Notes
washers, lock washers, and nuts).
Mast Saddle
TP-5580101-A
FEBRUARY 2022

Advertisement

Table of Contents
loading

Table of Contents