Section 4 Installation; Pre-Installation Check; Recommended Installation Tools; Table 4-1 Tools And Materials Required For Installation - Will Burt Hurry-Up Mast 3.5-7 Operator's Manual

Telescoping mast
Table of Contents

Advertisement

Section 4
This section provides instructions for installing the Hurry-Up® Mast and provides the general
procedures that must be followed to ensure a successful installation. Be sure to read and
understand the entire installation procedure and the Safety Summary (Section 1) before
beginning installation.

4.1 Pre-Installation Check

Before installing the mast system, ensure:
All installers read and understand the entire installation procedure.
Only a properly trained and qualified certified electrician performs electric installations
and maintenance.
The mounting structure is level and has sufficient room and strength to mount the mast
system.
All purchased components are included (Section 2.4).
All required equipment is readily available (Section 4.2).
When installing in a vehicle, ensure that the vehicle is stationary and on a level surface.

4.2 Recommended Installation Tools

Table 4-1 lists recommended tools and materials for installation.
Wrenches
Safety Gloves
Sockets
Hoist
Hammer
Drill
Note: Depending on the national and local standards and codes of practice, and the environment, additional
personal protective equipment may be necessary.
TP-5928001-C
February 2023
Installation

Table 4-1 Tools and Materials Required for Installation

Tools and Materials
Screwdrivers
Sling / Strap
String or Thin Wire
Torque Wrench
Level
Loctite® 242/243 (Blue) or
Equivalent
H
-U
® M
O
URRY
P
AST
PERATOR
Thread Tape
Measuring Tape
Plumb Bob
Safety Glasses
Saw
Pipe Thread Sealant or PTFE Tape
'
M
S
ANUAL
4-1

Advertisement

Table of Contents
loading

Table of Contents