Replacing The Rack Rails - HPE Synergy 12000 Frame Maintenance And Service Manual

Hide thumbs Also See for Synergy 12000 Frame:
Table of Contents

Advertisement

Replacing the rack rails

Replacing the rack rails
NOTE:
NOTE:
Rack rails are marked "LEFT" and "RIGHT" for identification. Use the rail release levers only when removing the rail from
the rack.
Procedure
Procedure
1. Beginning with the left rack rail, shorten the rail.
2. Align the rear end of the rail with the rack rear column.
3. Position the rail tabs next to the square openings in the rack rear column.
4. Keeping the rail level, insert the rear rail tabs into the rack rear column, and then push the tabs down into place.
5. Extend the front of the rack rail to the rack front column.
6. Position the rail tabs next to the square openings in the rack front column.
Replacing the rack rails
80

Advertisement

Table of Contents
loading

Table of Contents