HPE Synergy 12000 Frame Maintenance And Service Manual page 76

Hide thumbs Also See for Synergy 12000 Frame:
Table of Contents

Advertisement

10. Close the input connector cover.
11. Remove the output connector cover from the new power supply.
12. Insert the power supply into the frame until it locks into place. The power supply is marked with TOP to ensure proper orientation
during installation.
13. Connect the power cables to the -48V DC power source.
14. Turn on or enable the -48V DC power source.
15. Verify that the power supply LED is green.
Replacing the –48V DC power supply
76

Advertisement

Table of Contents
loading

Table of Contents