GE Versana Balance Basic Service Manual page 429

Table of Contents

Advertisement

physical dimensions, 3-20
physical inspection
at arrivel, 3-18
position
of tilt and shock indicators, 3-9
Power On, 3-24
precautions
certified electrical contractor statement, i-16
damage in transport, i-16
important precautions, i-3
service safety considerations, i-17
translation policy, i-3
prepeare for setup, 3-18
prerequisite
provided by customer, 8-9
print keys
assigning to a device or dataflow, 3-91
probe
connect, 3-24
probe cleaning, 10-18
probe leakage current test, 10-28
probe maintenance, 10-17
basic probe care, 10-17
basic probe cleaning, 10-18
probe related checks, 10-17
probe related checks, 10-17
probes environmental requirements, 2-11
operational and storage temperature for probes,
2-11
product icons, 1-11
product locator installation card, 3-106
products covered by this manual, 1-5
proprietary to GE Healthcare, i-18
Purchaser responsibilities, 2-13
R
rear panel
connections, 3-24
receiving and unpacking, 3-6
receiving the product, 3-8
recycling information
packing materials, 3-17
removable media
verifying, 3-94
required facility needs, 2-14
requirements, 2-3
requirements verification, 3-20
returning/shipping probes and repair parts, 1-24
revision history, i-1
S
safety
human, 1-14
safety precaution messages, 1-8
safety test overview, 10-20
service safety considerations, i-17
Versana Balance – Basic Service Manual
5808768-100 English Rev.9
setup
completion, 3-19
preparations, 3-18
reminders, 3-3
setup time, 3-3
setup warnings, 3-3
shipping/returning probes and repair parts, 1-24
shock and tilt indicators
position, 3-9
shock indicator, 3-7
site preparations, 2-1
time and manpower requirements, 2-11
software loading, 8-9
software/hardware compatibility, 9-4
software-hardware
compatibility, 5-3
specifications, 3-20
electrical specifications, 3-21
physical dimensions, 3-20
standard GE tool kit, 10-7
standard hazard icons, 1-9
statement
certified electrical contractor statement, i-16
system
specifications, 3-20
system checks, 10-12
system maintenance, 10-11
physical inspection, 10-15
preliminary checks, 10-11
system manufacturer, 1-28
system requirements verification, 3-20
system setup, 3-1
T
tilt and shock indicators
position, 3-9
tilt indicator, 3-7
time and manpower requirements
site preparations, 2-11
tools required, 10-7
special tools, supplies and equipment, 10-10
standard GE tool kit, 10-7
trademarks, i-18
translation policy, i-3
transport
damage, i-16
transportation
shock indicator, 3-7
tilt indicator, 3-7
transportation box label, 3-11
typical users of the service manual, 1-4
U
unpacking, 3-6
USB
flash card
Index-3

Advertisement

Table of Contents
loading

Table of Contents