GE Versana Balance Basic Service Manual page 325

Table of Contents

Advertisement

7-6-3-6-1e-PAT(continued)
Versana Balance – Basic Service Manual
5808768-100 English Rev.9
2. Insert the SSA key and press Insite ExC
Desktop > Diags > Run Diags > Probe Assessment.
3. Select Start.
The Probe Diagnostics commence. While the test proceeds,
the name of the test currently in progress is displayed in the
Selected Diagnostics field. As the testing sequence
progresses, the progress bar in the Total Progress field will
advance to reflect the test progress.
4. At any stage, press Stop or Reset button, if required.
5. When the probe diagnostics is completed, there will be
Pass/Fail information listed in the Diognostic Results
Summary field to indicate whether the probe diagnostic is
completed successfully or not.
Network and Common Diagnostics
System view
> Service
7-47

Advertisement

Table of Contents
loading

Table of Contents