7 Installation

Completing electrical installation

7.9
Completing electrical installation
If you have connected a PC for commission-
ing (see "7.6.7 Connecting a PC via RS485
(optional)", page 77), you must disconnect the
PC from the inverter again after commissioning
(see "8.2 Commissioning with the Delta Service
Software (DSS)", page 86)!
84
1. Remove the Allen key from the top of the door.
2. Close the door.
3. Close the upper door latch and screw on the cover.
Installation and operation manual M70A_260 Flex RPI703M26000 EU V1.1 EN 2022-08-02