Installation and operation manual M70A_260 Flex RPI703M26000 EU V1.1 EN 2022-08-02
13 Replacing the inverter
10. Use a voltmeter to check that there is no more voltage at
the AC terminal block.
→ If you detect voltage, open the AC power external load
isolating switch.
→ If you detect no voltage, continue to the next step.
11. Unscrew the AC cable gland.
12. Unscrew the conductors of the AC cable and pull out the
AC cable.
155