Installation and operation manual M70A_260 Flex RPI703M26000 EU V1.1 EN 2022-08-02
11 Replacing or cleaning components, installing accessories
Installing/replacing type 2 combined AC surge protection devices
2. Mount the Sub-1G antenna and screw it on so that it can
still be rotated.
3. Slide the mounting frame over the Sub-1G antenna upside
down from below.
4. Rotate the mounting frame with the Sub-1G antenna
upward.
5. Screw on the mounting frame.
139