Outdoor Stations; Mounting - ABB Welcome IP Manual

Hide thumbs Also See for Welcome IP:
Table of Contents

Advertisement

5.3

Outdoor stations

5.3.1

Mounting

For mounting an outdoor station, perform the following points:
1. First set the installation box for the corresponding mounting situation.
Surface-mounting: see chapter 5.1 "Outdoor stations: SM installation boxes" on page
32.
Flush-mounted installation in solid facades: see chapter 5.2.2 "Mounting in clinker
facades" on page 36.
Flush-mounted installation in insulated facades: see chapter 5.2.1 "Mounting in
insulated facades" on page 34.
Flush-mounted installation in hollow walls: see chapter 5.2.3 "Mounting in hollow walls"
on page 37.
Fig. 16:
Mounting outdoor station: Inserting the device (Example of flush-mounted installation box)
2. When the installation box is set:
Establish the connection on the device.
Insert the device into the installation box.
Set the device at the bottom into the holding fixture and fold it up.
The two spring pins at the top on the device must latch into the installation box.
System Manual
Connection, installation / mounting
│39

Advertisement

Table of Contents
loading

Table of Contents