ABB Welcome IP Manual page 38

Hide thumbs Also See for Welcome IP:
Table of Contents

Advertisement

3. Insert the flush-mounted installation box into the cutout.
Attention:
Ensure that the encircling "Collar" of the flush-mounted installation box rests on the
facade. The encircling "Collar" of the flush-mounted installation box must not be
submerged in the facade. The device can then not be mounted later.
Fig. 15:
Mounting installation boxes in hollow wall: Clamping flush-mounted installation box
4. Tighten the clamps.
The clamps click automatically into the correct position.
5. Mounting the outdoor station.
see chapter 5.3 "Outdoor stations" on page 39.
System Manual
Connection, installation / mounting
│38

Advertisement

Table of Contents
loading

Table of Contents