Verify The Operation Of An Added Drive; Replace A Power Supply Module In An Nvme Expansion Enclosure; Identify A Faulted Power Supply From Powerstore Manager - Dell EMC PowerStore 500T Installation And Service Manual

Hide thumbs Also See for EMC PowerStore 500T:
Table of Contents

Advertisement

Figure 105. Installing the bezel

Verify the operation of an added drive

Steps
1. From PowerStore Manager, select Hardware.
2. Select the appliance where you added the drive.
3. On the Components card, under Drives, expand ExpansionEnclosure and select the drive.
The status of the drive should read Healthy. If the status is still Faulted, wait a few minutes and refresh PowerStore
Manager. If the status does not change, ensure that the drive is correctly seated, or contact your service provider.
Replace a power supply module in an NVMe expansion
enclosure
Take the following actions to remove the faulted power supply module from the NVMe expansion enclosure and install a
replacement power supply.

Identify a faulted power supply from PowerStore Manager

Before you replace a power supply, use PowerStore Manager to identify its location within the system.
Steps
1. From PowerStore Manager, select Hardware.
2. Select the appliance that includes the power supply that you need to replace.
3. On the Components card, under Rear View, expand ExpansionEnclosure.
4. Expand the node that includes the power supply, and then select PSU0.
Faulted parts appear in red in the image of the system, and report a status of Faulted in the State field.
90
NVMe expansion enclosure service procedures
CL5262

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents