Tools Required To Unpack And Prepare The Ptx3000 Packet Transport Router For Installation; Step 2: Unpack The Ptx3000 Packet Transport Router; Step 3: Install The Ptx3000 Packet Transport Router Mounting Hardware; Install Cage Nuts, If Needed - Juniper PTX3000 Quick Start Manual

Packet transport router
Hide thumbs Also See for PTX3000:
Table of Contents

Advertisement

Tools Required to Unpack and Prepare the PTX3000 Packet Transport Router for Installation

Step 2: Unpack the PTX3000 Packet Transport Router

Step 3: Install the PTX3000 Packet Transport Router Mounting Hardware

Install Cage Nuts, If Needed

Copyright © 2014, Juniper Networks, Inc.
Tools Required to Unpack and Prepare the PTX3000 Packet Transport Router for Installation
The following tools and parts are required to unpack and prepare the PTX3000 router
for installation:
A mechanical lift—recommended
1/2-in. (13-mm) open-end or socket wrench to remove bracket bolts from the shipping
pallet
Phillips screwdrivers, numbers 1 and 2
7/16-in. (11-mm) nut driver, for tightening nuts to the terminal studs on each power
distribution unit on a DC-powered packet transport router
CAUTION:
You must use an appropriate torque-controlled tool to tighten
the nuts. Applying excessive torque damages the terminal studs. The
maximum torque that may be applied to this nut is 24 lb-in. (2.7 Nm).
Cage nuts, if needed for your rack or cabinet
Electrostatic discharge (ESD) wrist strap, to be used when handling electronic
components
Antistatic mat, to be used when installing or removing components from the chassis
Blank panels to cover any slots not occupied by a component
For detailed instructions on how to unpack the shipping crate and verifying the parts
received, see the PTX3000 Packet Transport Router Hardware Guide.
To install the mounting hardware, perform the following procedures:
Install Cage Nuts, If Needed on page 5
Install the Mounting Shelf on page 6
Insert cage nuts on the front rack rails, if needed. The hole distances are relative to the
standard U division on the rack that is aligned with the bottom of the mounting shelf.
To install cage nuts on the front rack rails:
Insert cage nuts in the holes specified for the mounting shelf (see
1.
NOTE:
A mounting shelf is not required to install the packet transport
router.
Table 1 on page
6).
5

Advertisement

Table of Contents
loading

Table of Contents