Replacing The Fan, Gas Valve, And Burner - IBC SL Series Installation & Operating Manual

Commercial condensing boiler
Table of Contents

Advertisement

Boiler
Component
test again to try and flush any debris that may be lodged
in the valve. If repeated tries fail to stop the leakage,
contact a licensed contractor or qualified service
personnel to replace the valve.
While performing a "try lever test", a quantity of heat
transfer fluid will be discharged from the piping system
and the system pressure will drop. This fluid must be
replaced. To refill and pressurize your system, we
recommend using a system pressurization appliance
such as an Axiom Industries model series. Capture the
discharged fluid in a container and recycle it by
returning it to the system feeder appliance. This is
particularly important when your system contains
treatment chemicals or glycol solutions. If the system
employs plain water, the boiler auto fill valve must be
turned on in order to recharge the lost fluid.

7.3 Replacing the fan, gas valve, and burner

This section documents the following maintenance procedures:
Replacing the fan
Replacing the gas valve.
Replacing the burner.
Maintenance Required
78
Section: Service and maintenance
Frequency
Check

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl 26-260 g3Sl 40-399 g3

Table of Contents