IBC SL Series Installation & Operating Manual page 95

Commercial condensing boiler
Table of Contents

Advertisement

5
Slide the condensate trap over the
boiler drain outlet, and then tighten
the upper union nut.
7.4 Cleaning the condensate trap
6
To reinstall the condensate retainer, tilt
and slide the two retainer tabs under the
chassis of the boiler, and secure with the
two wing nuts.
91

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl 26-260 g3Sl 40-399 g3

Table of Contents