IBC SL Series Installation & Operating Manual page 40

Commercial condensing boiler
Table of Contents

Advertisement

Warning
In areas of high snowfall, users must be advised to check side wall vent and air
intake terminations on a regular basis to ensure blockage does not occur.
Where an exhaust passes through a sidewall too close to a soffit, the venting must
extend past the soffit by transitioning to vertical as shown in
Figure 27
Sidewall vent termination transition to vertical to clear soffit
This illustrates the scenario where indoor air is used for combustion. Where combustion
air is drawn from outdoors, combustion venting should also transition to vertical and
terminations should observe the limitations set out in Fig. 5.
Figure
36
Section: Installation
27.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl 26-260 g3Sl 40-399 g3

Table of Contents