IBC SL Series Installation & Operating Manual page 58

Commercial condensing boiler
Table of Contents

Advertisement

Section: Installation
Optional external tridicator gauge: An internally mounted tridicator is factory-installed. An
external tridicator can be fitted if required by local jurisdiction.
Flow direction: To supply manifold
Flow direction: From return manifold
Drain with cap
Figure 37
Multiple boiler piping - four staged boilers, single load
Supply to heating system.
Secondary loop sensor (to master boiler).
Closely-spaced tees are a maximum of four pipe diameters apart, with a minimum of
eight pipe diameters of straight piping upstream of the first tee and a minimum of four
pipe diameters of straight piping downstream of the second tee.
Return from heating system.
54

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl 26-260 g3Sl 40-399 g3

Table of Contents