Download Print this page
IBC SL 10-85 G3 Manual

IBC SL 10-85 G3 Manual

Installing the condensate trap

Advertisement

Quick Links

120-289R2
Installing the condensate trap (SL 10-85 G3, SL 14-115 G3, SL 20-160 G3, and SL 30-199 G3 boilers)
Warnings
Fill the trap with water before firing the boiler to prevent exhaust fumes form
entering the room. Never operate the boiler unless the trap is filled with water.
Ensure all trap fittings are tightened to prevent leakage of flue gas.
Notes
Pipe condensate drain within 1" of a drain or connect to a condensate pump.
Slope the drainage line down to the drain at a pitch of ¼"/Ft, so that the
condensate runs towards the drain.
Checking, cleaning, and filling the condensate trap every 2 months is
important.

Advertisement

loading

Summary of Contents for IBC SL 10-85 G3

  • Page 1 Installing the condensate trap (SL 10-85 G3, SL 14-115 G3, SL 20-160 G3, and SL 30-199 G3 boilers) Warnings Fill the trap with water before firing the boiler to prevent exhaust fumes form entering the room. Never operate the boiler unless the trap is filled with water.

This manual is also suitable for:

Sl 20-160 g3Sl 14-115 g3Sl 30-199 g3