Do you have a question about the SL 20-115 G2 and is the answer not in the manual?
Questions and answers
Larry Christianson
January 20, 2025
On the window in the door for different settings, a red bar appears saying low air, usually after running on high fire for a long period.
1 comments:
Mr. Anderson
May 14, 2025
The low air warning on the IBC SL 20-115 G2 may indicate a blockage in the combustion air intake system, which can occur after running on high fire for a long period, especially if there is contamination from ingested particulate matter. An optional air intake filter may help prevent this.
Page 1
• If you cannot reach your gas supplier, call the fire department. Installation and service must be performed by a qualified installer, service agency or the gas supplier. This Manual is also available in French - contact IBC or visit our web site www.ibcboiler.com www.ibcboiler.com...
Page 2
† boilers are shipped with 30 psig pressure relief valve NOTE Supplied with the boiler - The IBC boiler is shipped with an accessory parts kit consisting of the following items: Points out installation, • 1 x Wall mounting bracket maintenance and operation •...
SL 20-115 G2 MODULATING GAS BOILER CONTENTS INSTALLATION........... . 1-1 GENERAL .
Page 4
SL 20-115 G2 MODULATING GAS BOILER The Installer must carefully read this manual to ensure that all installation details can be adhered to. Special attention is to be paid to clearances and access, vent travel and termination, gas supply, condensate removal and combustion air supply.
SL 20-115 G2 MODULATING GAS BOILER CODE REQUIREMENTS The SL 20-115 G2 model was tested to and certified under CSA 4.9-2014 / ANSI Z21.13-2014. Installation must conform to local codes, or in the absence of these, with the latest editions of CAN/CGA B149.1 and the Canadian Electrical Code Part 1 CSA C22.2 No.
SL 20-115 G2 MODULATING GAS BOILER contaminants; combustion air should be drawn from a CLEAN source WARNING (e.g. outdoors) and the boiler should be isolated from interior dust sources. Exposed water piping and associated components (relief valves, circulators, etc.) DISTANCE FROM...
Page 8
SL 20-115 G2 MODULATING GAS BOILER All venting must be installed in accordance with the requirements of the WARNING jurisdiction having authority: in Canada, Part 8, Venting Systems of the B149.1- 10 Code and any other local building codes are to be followed. In the USA Venting, condensate the National Fuel Gas Code, ANSI 223.1, latest edition, prevails.
Page 9
(e.g. boiler room, attic and/or chase). EXHAUST VENT MATERIAL – USA IBC strongly recommends that only CPVC or PPs vent component systems approved under UL1738 (Standard for Venting Systems for Gas Burning Appliances, Categories II, III and IV), ULC-S636 Standard for Type BH Gas Venting Systems, or stainless steel Type BH venting systems* are to be used, but many local jurisdictions in the USA still allow the use of PVC (Sch.
Page 10
CPVC or PPs (Rigid Single Wall) piping is the standard venting option; with this, the SL 20-115 G2 boiler, for example, can be sited up to 100 equivalent feet from the vent termination using 2” or up to 240’ using 3”. The actual vent travel allowance is reduced for fittings in accordance with Table 3.
Page 11
Some local jurisdictions require a minimum initial length of pipe be exposed or accessible for inspection. • Pipe clearances - no IBC requirements, but best practice allows a minimum 1/4” open annulus around the pipe to prevent binding and expansion noise; follow local codes.
Page 12
3’ apart (the closest intake and exhaust pipes shall be 36” - or more - apart). Use the same 24” (minimum) vertical separation for 2 pipe option. For alternate group terminations, contact the IBC Factory for written guidance. • Roof Top Concentric Termination Kits are approved for use with this boiler model.
Page 13
Clearance under veranda, porch, deck or balcony: - 12” (0.3m) IBC strongly Figure 6: Prohibited installation recommends a minimum of 24” with the SL 20-115 G2 to avoid damage to the structure. Note: Prohibited unless fully open on a minimum of two sides below the floor.
Page 14
SL 20-115 G2 MODULATING GAS BOILER CAUTION Vent termination clearances in this section are code minimum, or IBC recommended minimum requirements, and may be inadequate for your installation. Building envelope details must be examined carefully, and ingress of moisture into building structures is to be avoided.
Page 15
The Stainless Sidewall Terminal (SST), 2 inch IBC part number 180-148 (sold Users must be advised to separately included with IBC kit P-256 ) or 3 inch IBC part number 180-149 check side wall vent and (sold separately included with IBC kit P-257 ), are the only direct vent sidewall air intake terminations on terminals approved for use with the this IBC boiler model.
Page 16
SL 20-115 G2 MODULATING GAS BOILER Figure 12: Allowed SST installation orientations Figure 13: Pipes extend completely through the wall (Vertical orientation shown). Figure 14: Minimum separation for multiple vent installation, vertical orientation Figure 15: Minimum separations for multiple vent installation, horizontal orientation...
Page 17
SL 20-115 G2 MODULATING GAS BOILER 1.4.7 “Direct Vent” Combustion Air Intake Piping There are two basic methods of supplying combustion air to an IBC boiler. The direct vent option uses piping from the outside to supply combustion air directly to the boiler’s combustion air connection.
Page 18
SL 20-115 G2 MODULATING GAS BOILER For the inlet air – Schedule 40 PVC, CPVC, ABS or PPs piping of any type is permitted. Use same diameter as Vent pipe. It is not permitted to add to the exhaust length by transfer of unused NOTE: intake allowance.
Page 19
If combustion air contamination from ingested particulate matter may be a NOTE concern in any installation, an optional air intake filter may be installed. IBC supplied air intake filters have a known pressure drop and fouling factor and Combustion fan...
SL 20-115 G2 MODULATING GAS BOILER CONDENSATE REMOVAL IBC’s specified vent configuration promotes the safe drainage of moisture from WARNING the boiler and exhaust venting without flowing liquids back through the heat exchanger (as done by some other condensing boilers).
Page 21
SL 20-115 G2 MODULATING GAS BOILER 1.5.3 Condensate Trap Assembly - cleaning procedure Turn off the power to the boiler and allow it to cool down. Remove the trap from the boiler (reverse the installation procedure above). Remove the Trap Cleanout Assembly (H), from the Trap Body and clean and flush the debris out.
Page 22
SL 20-115 G2 MODULATING GAS BOILER Figure 21: Condensate trap disassembly for cleaning Figure 22: Condensate trap drainage WARNING If condensates are to be discharged into building drain piping materials that are subject to corrosion, a neutralization package must be used.
In short – IBC has built a boiler that will allow you to pipe the system the way you prefer, rather than try and dictate your piping practices from boiler to radiator.
Page 24
SL 20-115 G2 MODULATING GAS BOILER The SL modulating series boilers are designed for use within a closed loop, forced circulation, low pressure system. A 30 psi pressure relief valve (3/4” NPT) is supplied for field installation at one of the locations shown in the following illustrations.
Page 25
For best results, use a Primary: Secondary piping system, with a pumped boiler refrigerated air circulation loop using 1” piping for the SL 20-115 G2. Heat exchanger head is only 1.5’ at 4 must be equipped with USgpm and approximately 4’ at 10 USgpm.
Page 26
SL 20-115 G2 MODULATING GAS BOILER The SL Series modulating boilers are designed to supply three different WARNING heating loads with temperatures within the range 34°F to 180°F - to meet three separately piped loads. Use closely spaced tees to connect each pumped “load”...
Page 27
SL 20-115 G2 MODULATING GAS BOILER NOTE This piping drawings in this manual are simple schematic guides to a successful installation. There are many necessary components not shown, and details such as thermal traps are left out so the drawings have greater clarity.
Page 28
SL 20-115 G2 MODULATING GAS BOILER Figure 30: Basic Primary/Secondary piping with hydraulic separator concept Figure 31: Important Primary/Secondary piping details with hydraulic separator 1-24 INSTALLATION AND OPERATION INSTRUCTIONS...
Page 29
SL 20-115 G2 MODULATING GAS BOILER Propylene glycol solution is commonly used in a closed loop where freeze protection is required. Its density is lower than that of water, resulting in lower thermal performance at a given flow and pressure. As a rule of thumb,...
Page 30
SL 20-115 G2 MODULATING GAS BOILER If the installation involves small loads, as in typical zoned baseboard heating applications, use of a buffer tank is recommended. To aid in temperature transition from hot to cool loads, a 3-way mixing valve can be placed at the entrance to the cool load (this will also provide floor protection).
Page 31
(2 USgpm). For further information and details, consult our Application Notes – which provide detail on specific single and multiple boiler applications “Piping”, “Wiring” and “Settings”. (available at www.ibcboiler.com or from your IBC Representative). 1-27 BOILER SYSTEMS AND OPERATION...
Page 32
SL 20-115 G2 MODULATING GAS BOILER MULTIPLE BOILER PIPING - BENEFITS AND INSTALLATION RULES NOTE Multiple IBC boilers can be installed in a single heating system to provide For further information and redundancy, increased output, and greater heating plant turn-down capabilities.
SL 20-115 G2 MODULATING GAS BOILER 1.7 GAS PIPING The boiler requires an inlet gas pressure of at least 4.0" w.c. for natural gas or WARNING propane. For either fuel, the inlet pressure shall be no greater than 14.0" w.c.
Page 34
SL 20-115 G2 MODULATING GAS BOILER ELECTRICAL CONNECTIONS All Electrical wiring to the boiler (including grounding) must conform to local electrical codes and/or National Electrical Code, ANS/NFPA No. 70 – latest edition, or The Canadian Electrical Code, C22.1 - Part 1.
Page 35
Thermister - type with a resistance of 10,000 ohms at 25°C and β = 3892. We do Wiring Diagram for details. not recommend using 3rd party supplied sensors. Compatible water temperature sensors and outdoor sensors can be supplied by your IBC distributor. 1-31 INSTALLATION...
Page 36
SL 20-115 G2 MODULATING GAS BOILER 1.8.6 Thermostat Heat Anticipator IBC “Therm.” contacts draw no power, so an anticipator setting for the thermostat is not applicable with the SL modulating series boilers. In the case of a single temperature / heat load where zone valves are used to manage individual thermostatically controlled zones, each room thermostat’s heat anticipator should...
Load Combining – simultaneous operation of 2 similar water temperature loads • The control can manage and/or operate in a network of up to 24 IBC VFC or SL boilers Some of the new features available in the touch screen control include: •...
Page 38
SL 20-115 G2 MODULATING GAS BOILER Operational and historical data may be accessed at any time using the System Status and Load Profiles sections of the control. Error logs are available in the Diagnostics section and the controller is capable of recording any or all errors since original power-up complete with the date and time of the error.
COMMISSIONING The SL 20-115 G2 modulating boilers are factory calibrated to operate with natural gas (or propane if so ordered) at sea level. The Zero-offset valve adjustment cap has been factory sealed using red paint-seal compound. This cap must not be tampered with.
Page 41
SL 20-115 G2 MODULATING GAS BOILER To verify the proper operation of the gas valve in the field, the following procedure DANGER can be carried out by a qualified technician (see Figure 37). Making adjustments to the IBC With a small (1/8” or 3 mm) flat screwdriver, open the inlet gas supply gas valve without a properly pressure test port by turning its center-screw 1 full turn counterclockwise.
Fuel Conversion kits: changing from Natural gas to Propane – use IBC Part# P-199B; for changes from Propane to Natural gas – use IBC #P-200A. The following procedure must be carried out by a qualified technician (see Figure 34).
Page 43
SL 20-115 G2 MODULATING GAS BOILER BRASS ORIFICE RUBBER GROMMET Remove two venturi mounting screws Separate gas valve from venturi Figure 38: Gas Valve dissassembly to install or remove propane orifice STARTUP AND COMMISSIONING...
Page 44
SL 20-115 G2 MODULATING GAS BOILER 3.5.1 Gaining access to combustion chamber, burner NOTE removal instructions The safety warning regarding Remove fan and gas valve assembly. See “Fan and gas valve removal burner refractory on page instructions” on page 4-6 of this manual.
SL 20-115 G2 MODULATING GAS BOILER MAINTENANCE BOILER MAINTENANCE 4.1.1 General Care CAUTION • Keep combustible materials and flammable liquids and vapours away from the The owner is responsible for boiler. general care of the boiler. • Keep vent terminals clear of obstructions (snow, dirt, etc.).
Page 46
SL 20-115 G2 MODULATING GAS BOILER 4.1.6 Heat Exchanger CAUTION During annual inspection (with the burner removed), examine the heat exchanger The heat exchanger has a small for signs of contamination and clean if necessary. In areas of poor gas quality, amount of combustion chamber there may be a buildup of black plaque (typically sulfur).
Page 47
SL 20-115 G2 MODULATING GAS BOILER 4.1.12 Boiler Treatment WARNING • Check consistency of any boiler treatment used, for appropriate mixture. Do not use automotive-type Chemical inhibitors are consumed over time, lowering their density. ethylene or other types of •...
SL 20-115 G2 MODULATING GAS BOILER GEOGRAPHY & COMPONENTS Note: Vent stack piping and air intake riser have been removed in some of these photos for clarity Fan motor Gas valve Removing front cover Ignition module Fan pressure sensing tube...
Page 49
SL 20-115 G2 MODULATING GAS BOILER Water temperature high limit switch Water pressure sensor Combustion air intake riser Upper vessel high limit switch Ignition electrode/flame sensor Removing combustion air intake riser Outlet (supply) water temperature sensor Control Module disconnection Removing vent stack...
Page 50
SL 20-115 G2 MODULATING GAS BOILER 4.2.1 Fan and gas valve removal instructions Turn off electric power and gas supply to the boiler. Ensure boiler cools down to ambient temperature. Do not drain the boiler unless freezing conditions are expected during this procedure.
SL 20-115 G2 MODULATING GAS BOILER 5.0 TROUBLESHOOTING The troubleshooting section is divided into 3 sections: NOTE 5.1 Preliminary Checks This boiler is equipped with a 5.2 Electronic Components blocked vent shutoff system, which closes the gas supply 5.3 Troubleshooting Guide...
SL 20-115 G2 MODULATING GAS BOILER ELECTRONIC COMPONENTS This section details the method for troubleshooting the non-standard electronic components on the boiler including the electronic differential air pressure sensor and the temperature sensors. 5.2.1 Temperature Sensors The resistance of the temperature sensors varies inversely with temperature. To...
Page 53
Air Pressure Sensor tubing not correctly attached. If the Differential Air Pressure Sensor replacement is required, Ensure the replacement sensor is marked for use on the SL 20-115 G2 model boiler. Use of any other differential air pressure sensor is forbidden.
Page 54
SL 20-115 G2 MODULATING GAS BOILER 5.2.5 Hi-Limit Switches (water and UVHL) Check resistance between leads. If resistance is very low, temperature should be acceptable. If resistance is very high, temperature should be out of bounds. A simple means of checking whether a high limit switch is open is by measuring the AC voltage across the device.
SL 20-115 G2 MODULATING GAS BOILER 5.3 TROUBLESHOOTING GUIDE 5.3.1 Using Control Module Errors Displayed SYMPTOM DIAGNOSIS REMEDY AIRFLOW ERROR Check fan operation • Check lead is attached at fan. • Cycle power off/on; listen for fan initialization. Touch Screen Message: If no action, focus your attention on the fan itself.
Page 56
SL 20-115 G2 MODULATING GAS BOILER SYMPTOM DIAGNOSIS REMEDY MAXIMUM IGNITION TRIALS No spark when igniting. Check that igniter lead is secure at the control ERROR Igniter probe/flame module and at the probe. sensor disconnected. Touch Screen Message: Manual gas shutoff is Check for gas flow.
Page 57
SL 20-115 G2 MODULATING GAS BOILER SYMPTOM DIAGNOSIS REMEDY • TEMPERATURE SENSOR Current outlet Check water flow. ERROR temperature exceeds operating limit. Touch Screen Message: • Defective or Check wiring to temperature sensor and Error - Max. In-Out Temp. disconnected control module.
Page 58
SL 20-115 G2 MODULATING GAS BOILER 5.3.3 Cycling Problems SYMPTOM DIAGNOSIS REMEDY RAPID CYCLING Improper values Check load maximum temps are above target entered via keypad. temps, by 1/2 of the selected boiler differential. Ensure boiler differential is OK (16-30°F is...
Page 59
SL 20-115 G2 MODULATING GAS BOILER 5.3.4 Temperature Problems SYMPTOM DIAGNOSIS REMEDY INSUFFICIENT HEAT Operating increase temperature target. temperature too low. Priority parameters Review load configuration parameters. or load configuration improperly set up. Unit undersized. Refer to Load Calculation vs. Boiler Output.
Page 60
SL 20-115 G2 MODULATING GAS BOILER 5.3.5 Miscellaneous SYMPTOM DIAGNOSIS REMEDY FUMES AND HIGH HUMIDITY Improperly installed Refer to installation/operation instructions condensate trap Leak in vent piping Inspect using soap solution Flue gas leak within boiler Visually inspect all mechanical connections...
SL 20-115 G2 MODULATING GAS BOILER 6.0 DIAGRAMS 6.1 - PARTS DIAGRAMS 6.2 - WIRING DIAGRAMS 6.3 - SEQUENCE OF OPERATION DIAGRAMS...
Page 62
SL 20-115 G2 MODULATING GAS BOILER 6.1 PARTS DIAGRAMS SL 20-115 G2 Modulating Boiler - Parts assembly Diagram 6.1-1: Boiler assembly parts INSTALLATION AND OPERATION INSTRUCTIONS...
Page 63
SL 20-115 G2 MODULATING GAS BOILER ITEM NO. PART NO. DESCRIPTION 240-055 BLOWER/GAS VALVE/VENTURI 250-498 GAS INLET FITTING 190-055 GAS LINE 240-002 IGNITOR 250-050 GASKET, IGNITOR 250-552 GASKET, BLOWER TO HEAT EXCHANGER LID 250-057 VIEWPORT HOLDER 250-060 GASKET, VIEWPORT TOP...
Page 64
SL 20-115 G2 MODULATING GAS BOILER 6.2 WIRING DIAGRAMS Diagram 6.2-1: Ladder wiring diagram INSTALLATION AND OPERATION INSTRUCTIONS...
Page 65
SL 20-115 G2 MODULATING GAS BOILER INTERNAL WIRING DIAGRAM Better Boilers brown Combustion Valve blue blue 5 x plug blue blue orange green orange Transformer blue blue brown black Vent High black Limit black orange Switch Upper Vessel yellow High Limit...
SL 20-115 G2 MODULATING GAS BOILER 6.3 SEQUENCE OF OPERATION Diagram 6.3: Sequence of operation diagram INSTALLATION AND OPERATION INSTRUCTIONS...
Page 67
INSTALLATION & COMMISSIONING REPORT Boiler Details: Model Number _____________________ Serial Number ______________________________________________ Date of Installation ______________ Address of installation __________________________________________ _____________________________________________________________________________________________ User contact information _______________________________________________________________________ Installer Information Company ___________________________________________________________________ Address ______________________________________________________________________________________ Phone/Fax/E mail ____________________________________________________________________________ Fuel Natural Gas Propane Gas Supply Pressure (high fire) _______ Inches w.c. Measured Rate of Input (high fire) ____________ Btu/hr Installation instructions have been followed and completed (Section 1 of Installation and Operating Instructions).
Page 72
• This boiler is part of a modular or multiple boiler system having a total input 300,000 BTU/hr or greater. • This boiler is equipped with a tankless coil (not applicable to IBC’s SL boilers). US installers should contact IBC for any further information required.
Page 73
REVISION HISTORY R1 (DECEMBER 2010) Initial release R2 (SEPTEMBER 2012) Polypropylene venting, fuel mixture Table 8 and US Energy Act disclosures added R3 (OCTOBER 2013) SL20-115-G2 Model Change R4 (AUGUST 2014) Addition of V10.0 Touch Screen Controller R5 (OCTOBER 2014) Propane orifice size change R6 (MAY 2015) Address update...
Need help?
Do you have a question about the SL 20-115 G2 and is the answer not in the manual?
Questions and answers
On the window in the door for different settings, a red bar appears saying low air, usually after running on high fire for a long period.
The low air warning on the IBC SL 20-115 G2 may indicate a blockage in the combustion air intake system, which can occur after running on high fire for a long period, especially if there is contamination from ingested particulate matter. An optional air intake filter may help prevent this.
This answer is automatically generated