at a pitch of ¼" per foot so condensate runs towards the drain.
1.
Remove the boiler door.
Ensure the supplied trap is
correctly installed and filled with
water.
When required, add (and maintain
in good condition) a neutralization
tank. For information on installing
a condensate neutralizer, see
Installation on page
The condensate trap must be
installed on the drain connection at
the base of the boiler. The
condensate drain must be piped to
within 1" of a drain or connected to
a condensate pump. The drainage
line must slope down to the drain
2.
To remove the condensate retainer,
undo the two wing nuts. Retain for later.
38
Section: Installation
15.