Siemens 8DJH Installation And Operating Instructions Manual page 63

Medium-voltage switchgear
Table of Contents

Advertisement

500-8384.9 • Version 11 • Installation and Operating Instructions • 8DJH
6. Only for panels in wall-standing arrangement (except metering panels): Fasten the top
unit for the pressure relief duct using 8 bolt-and-washer assemblies.
Fig. 47: Mounting the top unit
7. Bolt the cable bracket
tapping bolts M6 (tightening torque: 12 Nm).
Fig. 48: Mounting the cable bracket (ring-
main panel)
8. Mount the cross member [▶ Page 126, "Removing and mounting the cross member"].
9. Hook the cable compartment cover in [▶ Page 125, "Removing and mounting the cable
compartment cover"].
10. From now, the high-voltage cables can be mounted.
11. Seal the joint between the switchgear and the base all around with silicone.
Fig. 50: Sealing the joint
, the adjustment rail and the cable clamps together using 4 self-
1
4x
Fig. 49: Mounting the cable bracket
(transformer panel)
1
2
3
8x
4x
Switchgear
Panel joint
Base
Installation | 7
63/174

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents