Siemens 8DJH Installation And Operating Instructions Manual page 5

Medium-voltage switchgear
Table of Contents

Advertisement

9.6.6
position ......................................................149
9.6.7
position ......................................................150
9.7
type 1.1 ......................................................150
9.7.1
breaker type 1.1 manually ............................151
9.7.2
Closing circuit-breaker type 1.1.....................152
9.7.3
Opening circuit-breaker type 1.1...................152
9.7.4
position ......................................................152
9.7.5
position ......................................................153
9.7.6
position ......................................................154
9.7.7
position ......................................................154
9.8
9.8.1
Voltage indicators........................................155
9.8.2
9.9
Replacing HV HRC fuse-links .........................160
9.10
Cable testing ...............................................163
9.10.1
Cable testing via cable plugs.........................163
9.10.2
Cable sheath test .........................................164
10
maintenance ......................................... 165
11
End of life .............................................. 166
12
Annex ..................................................... 167
12.1
MCU (Motor Control Unit) ............................167
12.1.1
12.1.2
Application..................................................167
12.1.3
Design ........................................................167
12.1.4
Fault signals ................................................168
12.1.5
Index ...................................................... 171
500-8384.9 • Version 11 • Installation and Operating Instructions • 8DJH
5/174

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents