2. Change the position of the transformer mounting plate 
bolted joint 
.
10
3. Refasten the transformer mounting plate with the 2 hexagon head bolts 
Fig. 147: Correcting the position of the transformer mounting plate
4. Remove the voltage transformer 
5. Screw the centering bolt
6. Screw the centering bolt
7. Remove the centering bolt
✓ Now the instrument transformer fixing is adjusted for instrument transformer installation.
The cables can be connected to the feeder.
Connecting the voltage transformers
If a power-frequency voltage test is planned on site after switchgear installation ( [▶ Page 131,
"Preparing the power-frequency voltage test"]), do not mount the voltage transformers yet.
1. Mount feeder cables and cable plugs
voltage cables"].
2. Remove the sealing stoppers of the cable plugs.
Fig. 148: Connecting the cable
8DJH • Installation and Operating Instructions • Version 11 • 500-8384.9
together with the transformer slide 
5
into the left-hand bushing and adjust in the same way.
8
into the central bushing and adjust in the same way.
8
.
8
on the bushings, [▶ Page 103, "Connecting high-
1 2
Cable plug
1 2
by readjusting the front and rear
5
located inside.
11
again.