7 | Installation
60/174
Installation with pressure relief duct and base supplied separately:
1. Panels in free-standing arrangement or metering panels: Bolt the two parts of the
pressure relief duct together using 8 self-tapping bolts M6.
2. Panels in wall-standing arrangement (except metering panels): Do not yet install the top
unit of the pressure relief duct.
3. Bolt the pressure relief duct together with the fixing brackets on both sides of the base using
6 self-tapping bolts M6 each.
Panels in wall-standing arrangement (except meter-
ing panels):
4. Install the bases of all panels and line them up.
5. Bolt the bases together using 2 bolts and nuts M8 each.
Fig. 39: Bolting the bases together (example)
8DJH • Installation and Operating Instructions • Version 11 • 500-8384.9
Metering panels or panels in free-standing
arrangement:
2x6
8x
2x6