7.21.11 Connecting the secondary equipment

Tab. 47: Availability of lateral wiring ducts in the cable compartment
Panel type
Lateral wiring duct
Panel without current transformers
Panel with current transformers
124/174
Wires for secondary equipment can be laid to the side, to the rear or downwards. For panel
blocks, wire routing across panels is possible through the wiring duct located on the operating
mechanism box (option) or through the front operating mechanism box. For extendable
switchgear, wire routing through the wiring ducts is recommended.
Fig. 162: Wire routing with wiring duct on
the operating mechanism box
Fig. 164: Wire routing in the operating
mechanism box
Blocked ready-for-service indicator
Wires for secondary equipment can block the transmission linkage of the ready-for-service
indicator. This can damage the switchgear due to an incorrectly indicated service readiness.
⇨ Lay the wires at a large distance to the transmission linkage.
R, K, K(E)
left
right
on request
on request
on request
partially occu-
pied
The terminal strips of the secondary equipment supplied are assigned to the associated
operating mechanisms or feeders. For information about the external connection, see the
supplied circuit diagrams.
8DJH • Installation and Operating Instructions • Version 11 • 500-8384.9
Fig. 163: Wire routing through the operating
mechanism box
1
Wiring duct on the operating mechanism
box (option)
Lateral wiring ducts (recommended wire
2
routing downwards)
3
Wire routing through the operating mech-
anism box and sideways through the cover
Ready-for-service indicator
4
Fixing duct
5
Terminal strip
6
Customer-side wiring
7
NOTICE
T
left
right
partially occu-
yes
pied
partially occu-
pied
L
left
right
yes
yes
partially occu-
pied

Hide quick links: