Preparing The M-Station For Operation - Renesas M-Station User Manual

Baseboard for 78k0 and 78k0s micro-boards
Table of Contents

Advertisement

M-Station Baseboard

7. PREPARING THE M-STATION FOR OPERATION

Before using the M-Station with a micro-board or target system, you must configure the M-Station to
match the power configuration, voltage levels, and programming and communication methods of the
micro-board or target system.
1.
Set JP1, JP2, JP3 and JP4 for the proper power configuration of the M-Station and micro-board or
target.
2.
Set JP8 and JP9 for the proper flash programming and communication configuration.
3.
Set the jumpers connecting ROW1 and ROW2 on the M-Station if the micro-board will be using
the M-Station application hardware.
4.
Set any necessary jumpers on the micro-board or target for power, flash programming, and
communication options.
5.
Connect the M-Station to the micro-board without power supplied. (Note: if battery power on the
M-Station is to be used, JP2 should be out at this point.)
6.
Connect the M-Station to the computer using a standard USB cable. Wait for the USB LED to be
on steadily.
7.
Connect power to the M-Station or the target system by either connecting the AC adaptor
supplying 12V to the J8 power connector, connecting JP2 to "BAT" to supply battery power, or
powering the target system.
At this point, the M-Station and micro-board are ready for operation and you can begin using the
OPTMST, FP4MST, or MSTTERM programs. To power-down and disconnect the M-Station and micro-
board, first close any running software application and then reverse the preceding steps.
38

Advertisement

Table of Contents
loading

Table of Contents