EA Technology UltraTEV Monitor Operating Manual page 79

Table of Contents

Advertisement

EA Technology
System Discovery for further details on this topic.
Create a new installation by clicking the Create New Installation button from either the list of
installations or from the substation which you wish to use.
The screen shown in Figure 65 will then be displayed. First of all drag the hub from the palette on
the left and place it on the substation layout. When hovering over an area that can be placed on, the
area will turn green.
Once the hub has been placed, the first Node is then available in the palette, again drag this onto
the layout. Once the first node has been placed, the palette then changes to now show the available
Sensors for that node. Figure 66 shows the palette as it will look now.
The process of creating an installation by dragging and dropping Sensors onto the layout diagram
is identical to that used in the System Discovery process on the device. Discovery for further details.
Figure 65: Creating a new installation
UltraTEV Monitor
Operating Manual
TM
76
2178L014

Advertisement

Table of Contents
loading

Table of Contents