Right-clicking any Node or Sensor displays a context menu from where the following actions can be
performed.
Cable Length
Set the length of the cable leading into the selected Node or Sensor. Either
select a predefined length or enter a custom one. Lengths to external TEV
probes and aerials are important for the PD calculations and must be
accurate. All other lengths are only needed to indicate the length of cable
required for commissioning the system.
String
(Nodes Only) Nodes can be assigned to one of four strings (depending on
Assignment
hardware configuration).
Assign/Un-
Assign or un-assign the node or sensor from its attached Node or string.
assign
When another Node is selected, available unassigned sensors will flash to
indicate that they can be assigned.
Remove
Removes the current item from the layout.
Remove All
Removes all the items from the layout.
Cable lengths that have yet to be entered will remain highlighted in red on the diagram. All cable
lengths must be entered before proceeding (the Complete button will be disabled until cable lengths
are entered). Once the layout is finished, click on the Complete button to complete the setup.
Figure 35: Confirming the installation layout
UltraTEV Monitor
Operating Manual
TM
46
2178L014