Figure 15: Hub Unit with Magnetic Brackets
Suitable provisions should be taken when routing any cables attached to the Hub to ensure that they
do not create a hazard.
6.2

Earthing

Both the Hub Unit and the Power Supply have M4 earth studs on the left side of their casing to allow
the UltraTEV Monitor to be bonded to an external ground system. Both the Hub Unit and Power
Supply cases must be bonded to earth when the UltraTEV Monitor™ is installed in a substation.
6.3

Connecting the Nodes

The UltraBus communication cables to the Nodes are wired in a daisy chain manner, i.e. each Node
has two connections, one for connection to the previous Node or Hub Unit (Server) and one for
connection to the next Node. The connections are made using CAT 7 Screened Twisted Pair (STP)
Ethernet cable. The cables supplied with the Monitor are colour coded to the colour blocks on the
Node label to simplify connection.
EA Technology.
Figure 16: Details of Node Ethernet cable colour coding
No specific Node connection order is required although a linear flow along the switchgear will make
the system easier to set up.
EA Technology if you require a larger system.
UltraTEV Monitor
Operating Manual
TM
If additional cables are required, they are available from
Each Hub Unit can support up to 20 Nodes.