3.8.3 Hub Start Up and Shut Down Procedures

With the Monitor Hub, Power Supply and relevant Node strings connected, the following procedure
should be followed to activate the system:
1. Apply power to the Power Supply and ensure the green Mains Power LED is ON
2. The Monitor Hub should now become active. This can be verified by monitoring the status
of the LEDs on the front panel which should show the following.
System Power – ON.
Monitor Health – FLASHING during boot sequence, ON when monitoring.
Alarm and SCADA Outputs (1-3) – OFF.
UltraBUS Power – OFF and consequently ON when in monitoring state.
When the UltraBUS Power LED is illuminated DO NOT connect/disconnect any of
the UltraBUS power connectors.
3. Alarm and SCADA outputs are configurable from the software by the end user. If any of the
Alarm and SCADA Outputs LEDs are ON, please analyse your settings in the software.
4. When the Monitor Health LED changes from Flashing to a steady state ON, the system will
be recording data.
5. To configure the Hub please refer to Section 11