Device Management And Settings - EA Technology UltraTEV Monitor Operating Manual

Table of Contents

Advertisement

EA Technology
As soon as everything is complete, click on the Complete button to finalise the system discovery
process (note: after you click complete the layout cannot be changed without repeating the process).
Another delay will occur here as the Nodes are communicated with.
Finally, the option to re-start the services is given. Select Yes here to re-start all the services. See
"Device Management and Settings" for more details regarding the services.
Now that system discovery has completed, the status message will turn to Monitoring Status Active
when everything is setup (see 10.2 The Local UltraTEV Monitor™ Web-Interface). If UltraTEV Cloud™
is being used; the communications with the cloud server has to be established. Providing that a
communications method has already been configured (3G, Wi-Fi or wired Ethernet), this process
should happen automatically. The status message will turn from Pending Cloud Registration to
Monitoring Status Active when everything is setup.

10.4 Device Management and Settings

Sometimes it may be necessary to shut-down the UltraTEV Monitor™ or power off the Nodes. These
can be achieved from the Power and System Status button in the admin navigation bar. Figure 366
shows the power management screen; from here the UltraTEV Monitor™ can either be shut-down or
restarted. Figure 377 shows the system status screen. Here the individual services can be stopped
and started. For healthy operation, these should always be running and are set to automatically start
whenever the device is first powered on. In order to power down the Nodes, the Monitor service will
need to be stopped.
If any Nodes are changed, the System Discovery process will need to be re-run.
This will mean creating a new installation through the web-portal.
Figure 36: Power Management
UltraTEV Monitor
Operating Manual
TM
47
2178L014

Advertisement

Table of Contents
loading

Table of Contents