Changing The Coolant Pipe - Husqvarna FC 450 2018 Repair Manual

Table of Contents

Advertisement

19.7
Chan in the coolant
WATER PUMP, COOLING SYSTEM 19
Main work
-
Position the motorcycle upright.
-
Place an appropriate container under the water pump cover.
O.
-
Remove screw
Take off radiator cap fj.
-
Completely drain the coolant.
-
Mount and tighten screw
Guideline
Screw, water pump
cover
Pour coolant in up to measurement
fins.
Guideline
f)
Distance
above the radi-
ator fins
Coolant
-
Mount the radiator cap.
-
Go for a short test ride.
-
Check the coolant level.
Finishing work
-
Install the engine guard.
e
Preparatory work
-
Remove the engine guard.
-
Drain the coolant.
(!!:!I
p. 255)
-
Remove the air filter box cover.
-
Remove the seat.
(0
p. 1 00)
-
Remove the right side cover.
-
Remove the fuel tank.
(0
Main work
O.
-
Pull off overflow hose
O
with a new seal ring.
M6
10 Nm (7.4 lbf ft)
f)
above the radiator
10 mm (0.39 in)
Coolant
(0
1.20 I
(1.27 qt.)
(0
p. 254)
(0
p. 52)
(!!:!I
p. 52)
(!!:!I
p. 96)
(0
p. 100)
p. 102)
p. 302)
...
257

Advertisement

Table of Contents
loading

Table of Contents