INFOSEC Mod5T User Manual page 38

Three phases modular ups solutions: 20 kva to 120 kva hv with 20 kva power modules
Table of Contents

Advertisement

Step 5: Then, UPS will enter Battery Mode as shown in the diagram below.
Step 6: Switch ON the output breaker (Q3). Cold start startup procedure is complete.
3.3.3 Maintenance Bypass Operation
Follow the instruction to transfer to Maintenance Bypass and UPS protection as below.
3.3.3.1 Transfer to maintenance bypass
Step 1: Remove the mechanical lock plate of Maintenance Bypass Breaker.
38
INFOSEC UPS SYSTEM - 15, rue du Moulin - 44880 Sautron - FRANCE - www.infosec-ups.com
Hot Line – Tel + 33 (0)2 40 76 15 82 - Fax + 33 (0)240 94 29 51 - hotline@infosec.fr – 03 17 AA 59 201 24

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Mod5T and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents